Trenchless technology


When constructing pipelines, it is not always possible or ideal to use traditional open-cut methods of installation. In these cases, such as when a pipeline route crosses a river or a major road, trenchless technology is used to install the pipeline with minimal surface excavation.

Benefits of using trenchless technology include reduced damage to roads and disruption to traffic; increased public and worker safety; and a number of environmental advantages, including minimised adverse impact on flora and fauna, reduced carbon emissions, and less pollution.

The most common trenchless construction method for transmission pipelines is horizontal directional drilling, which involves drilling a pilot hole beneath the sensitive area where an open trench cannot be made. The hole is then enlarged to the desired size during the reaming process, before the pipe is pulled back through the hole.

Another method is tunnelling, which uses a tunnel boring machine to create a hole into which the pipeline can be installed without disrupting the ground surface. A subset of this is microtunnelling, which uses the same method but on a much smaller scale. Microtunnelling boring machines (MTBM) are too small to have an operator and are thus steered remotely. Sometimes a jacking system will push the pipe in behind the MTBM in a process known as pipe-jacking.
More Less

Latest News

GasTransBoliviano uses HDD to cross Rio Grande

YPFB subsidiary GasTransBoliviano (GTB) is currently undertaking a 2.7 km horizontal directional drill under the Rio Grande as part of a project to secure gas deliveries through the Bolivia – Brazil Pipeline.
 
Punj Lloyd bags Thai pipeline construction contract

Punj Lloyd has been awarded an engineering proc...

Black Sea gas pipeline construction commences

Gazprom has begun constructing the 160 km offsh...

More
 

Magazine article

Drilling down deep in Louisiana

Michels Directional Crossings successfully…

Related Events

The Third International Forum on Transportation of CO2 by Pipeline

Hilton Newcastle Gateshead Hotel, Newcastle, UK
 

Practical Pigging Operations

CTDUT, Rio de Janeiro, Brazil
 
More